|
Bingham
Structures Laboratory
The major component of this laboratory is a 14-foot by 60-foot structural
test slab, which is the top flange of a 12-foot deep reinforced concrete
box girder. Load and tiedown points are provided by 3-inch diameter holes
spaced at 2-foot centers. Loading is accomplished by hydraulic jacks. The
laboratory also contains 200k, 50k, 25k universal testing machines, and
two (2) 55k MTS hydraulic actuators with a controller and a separate hydraulic
service manifold system.
|