Preparation of dry sand model
Soaking the PWP transducers in water for two days before the test.
Applying vacuum to force the latex membrane flush against the rings.
placing the bedding layer of a relatively permeable material.
supporting the saturation stand pipe.
Pouring the sand by dry pluviation with installing the instrumentation at the proper orientations and locations.